Open items

Everything marked "to be confirmed" in the current specification, and what unblocks it.

Items marked “to be confirmed” are not included in the offer. The offer is updated once each one is closed.

Tooling

Question Answer
Why tooling at all? 26” and 18” are non-standard sizes; existing moulds are 20 / 24 / 28 inch
Tooling lead time To be confirmed
Tooling cost To be confirmed
Which parts are shared with existing moulds To be confirmed

Quality testing

The sheet commits to four tests but not yet to their standard. No test report is issued until the standard is agreed.

Test Standard
Load — 32 kg To be confirmed
Wheel durability To be confirmed
Zipper cycles To be confirmed
Drop test To be confirmed

Packing and stuffing

Quantity per carton, gross weight and stuffing plan — all open. See carton and packing.

Production decisions

  • Production line for the 26” shell: vacuum forming or injection.
  • Side feet on the 26”: in-house production or purchase.
  • Logo application on both sizes: in-house production or purchase.
  • Identity sticker: whether variable-data application is inside the unit price.