Timeline
| Stage | Duration |
|---|---|
| Sampling | 7–15 working days |
| Production (bulk) | 25–55 days |
| New mould, end to end | ~80 days — 10 days to cut, 25 days to ship the mould, 45 days production |
Minimum order quantity
100 pcs per SKU, counted by colour × size combination.
What can be customised
| Item | Options |
|---|---|
| Branding on shell | Metal badge, silkscreen, paint, laser, printed lining, custom puller |
| Packaging and documents | Carton mark, barcode, hang tag, instruction sheet, PE bag, certificate of origin |
Warranty
One year as standard, adjustable to what the buyer needs. The agreed period goes on the order documents, not on this page.
How an order runs
Specification
Body dimensions, material, fittings and packing are written into a specification sheet. Anything undecided stays marked open rather than being filled in.
Sampling
A sample is produced and tested. Test results come back as a report on that sample.
Confirmation
The specification sheet is signed as an annex to the invoice. From here, material and fitting changes need written agreement from both sides.
Production
Bulk production runs 25–55 days from confirmation. In-process and pre-shipment inspection apply.
Shipment
Carton marking, documents and certificate of origin are issued against the agreed trade term.
Documents you will receive
Certificate of origin (COO / SKA: Form D, Form E, RCEP, IJEPA, ICO), packing list, and the test report for the tests that were run. What we do not have, we do not issue.